← All Royal Palm Beach cases · Every Miami P&Z portal we watch
25-126 — Other in Royal Palm Beach, FL
This case involves a Major Site Plan Modification and Architectural Approval for Lakeside Landing that includes adding a landscape wall, removing 29 specimen trees and 4 non-specimen trees, planting 65 replacement trees, modifying pavement connections, and adjusting driveway spacing. Developers should monitor this case if they have operations in the Lakeside Landing area or are considering similar tree removal and site modifications in Royal Palm Beach. The project may set precedent for how the Planning & Zoning Commission evaluates tree preservation mitigation and site plan modifications in existing developments.
| Case number | 25-126 |
|---|---|
| Type | Other |
| Location | northwest of the Okeechobee Boulevard and Royal Palm Beach Boulevard intersection |
| County | Palm Beach County |
| Petitioner | DR Horton, Inc |
| Owner | Lakeside Three, LLC and Lakeside Landing Property Owners Association, Inc. |
| Hearing | 2026-03-24 |
| Hearing body | Planning & Zoning Commission |
| Status | new |
Property & nearby activity
Other Royal Palm Beach rezoning cases
- 26-067 — Other
- 26-080 — Construction of new canopy over Vehicle Detail Areas and extension of existing canopy on north side of Body Shop Building C
- 26-072 — Re-roof existing commercial building with dark bronze metal roofing
- 26-063 — Exterior modifications to restaurant including stucco, siding, awnings, lighting sconces, repainting, and new wall and monument signage
- 26-061 — Other
Tracking this case? Zoning Firehose emails you the moment cases like this hit any Miami P&Z agenda — days before the hearing. Start a free trial.